A level playing field

levelling up sportshall floor

Sports flooring gets the right foundation for new line marking

Details

Client: For Sports Surfaces UK, Mill School, Bury

Type of Work: Flooring preparation, Line marking

Description

Full start to finish, groundwork preparation to final line marking. 

Previous slide
Next slide

Job Description

This week CMUK were brought in to undertake some essential preparatory works in readiness for installation of sports PU flooring at a school in Bury. Mill School in Bury provides a bespoke and tailored environment for children with Autism and SEMH and this project was an update to their indoor sports facility. 

The existing floor levels were taken at this school’s sportshall, this then enabled us to use our specialist equipment to grind the relevant high areas, while low areas were raised with screed to create the perfect level, prepared surface. 

Following the installation of the Pulastic Surface by Sports Surfaces UK we were able to go in and fix the brand new line markings in the sports hall. All our line markings are taken from the sports own governing body or from Sports England so you can rest assured that your games will be precise. The lines are applied using specialist high quality paints and vinyl. CMUK can also apply your own company or team logo within the lines of your floor. Read more about a similar project here.

Get in touch with us for your sports flooring needs today